Republika power station
Перник, Bulgaria · Energy sector
Republika power station is a Energy sector facility located in Перник, Bulgaria. It has reported emissions data to the E-PRTR register for 18 year(s) between 2007 and 2024. Its primary reported release is Carbon dioxide to air, with 244,429,000 kg reported in 2024.
42.60667, 23.07833
Pollutant releases in 2024
| Pollutant | Medium | Quantity |
|---|---|---|
| Carbon dioxide | AIR | 244.4 kt |
| Sulphur oxides | AIR | 1.8 kt |
| Nitrogen oxides | AIR | 477.0 t |
Waste transfers in 2024
| Treatment | Classification | Quantity |
|---|---|---|
| Disposal | Non-hazardous | 95.8 t |
| Recovery | Non-hazardous | 249 kg |
| Recovery | Hazardous | 26 kg |
| Disposal | Hazardous | 0 kg |
Carbon dioxide — year on year
2024 244.4 kt
2023 257.8 kt
2022 160.4 kt
2021 159.7 kt
2020 105.1 kt
2019 273.2 kt
2018 305.4 kt
2017 449.0 kt
2016 523.0 kt
2015 574.0 kt
2014 605.0 kt
2013 570.0 kt
2012 531.0 kt
2011 567.0 kt
2010 508.0 kt
2009 484.0 kt
2008 634.0 kt
2007 649.0 kt
Annex I activity: 1(c)
Sector: Energy sector